Research Article
Modelling and Metaheuristic for Gantry Crane Scheduling and Storage Space Allocation Problem in Railway Container Terminals
Table 1
The distance between the central axis of railway track and the storage space.
| Number of the locations | Distance (m) |
| 1 | 16.27 | 2 | 19.00 | 3 | 25.10 | 4 | 27.82 | 5 | 6.47 | 6 | 19.00 | 7 | 8.91 | 8 | 16.27 | 9 | 37.92 | 10 | 19.00 | 11 | 25.10 | 12 | 16.27 | 13 | 6.47 | 14 | 8.91 | 15 | 35.18 | 16 | 19.00 | 17 | 25.10 | 18 | 37.92 | 19 | 27.82 | 20 | 6.47 | 21 | 16.27 | 22 | 35.18 | 23 | 6.47 | 24 | 19.00 | 25 | 27.82 | 26 | 8.91 | 27 | 25.10 | 28 | 6.47 | 29 | 16.27 | 30 | 27.82 | 31 | 8.91 | 32 | 19.00 | 33 | 8.91 | 34 | 16.27 | 35 | 37.92 | 36 | 25.10 | 37 | 27.82 | 38 | 37.92 | 39 | 25.10 | 40 | 19.00 | 41 | 27.82 | 42 | 8.91 | 43 | 16.27 | 44 | 25.10 | 45 | 6.47 | 46 | 8.91 | 47 | 19.00 | 48 | 37.92 | 49 | 27.82 | 50 | 16.27 | 51 | 37.92 | 52 | 6.47 |
|
|