The single level continuous sampling plan (CSP-1) is an in-line process control tool that has been commonly adopted in various manufacturing industries. However, CSP-1 is designed for only satisfying the quality constraint. At the same time, CSP-1 has disadvantages with the high probabilities of both Type I and Type II errors due to its inherent deficiency coming from the operating procedure. In this work, an optimal scheme for process quality and cost control is proposed to monitor the process cost and improve the process quality. The CSP-1 and the process yield index () are integrated in the present scheme, which work independently and complementarily. The four parameters (clearance number, inspecting fraction, sample size, and critical value) are designed in the proposed scheme under simultaneously considering the quality and cost constraints. The sole feasible inspection scheme in CSP-1 under the two constraints is found and used for controlling the process quality. The probabilities of Type I and Type II errors are concurrently controlled at the stipulated level with the risk control scheme, which is constructed with two nonlinear inequation based on the accurate distribution of the index . A case study is illustrated to validate the effectiveness and practicality of the proposed scheme.

1. Introduction

With the advances in manufacturing and control technology, process quality can be constant at required level for the in-control process. Multiple constraints, such as quality, cost, risk, and environmental adaptability, are imposed on the process control. The constraints are originated from the intensifying market competition and the demand of sustainable development. Many kinds of process control tools are developed to monitor and improve the process quality under various constraints for the in-control process. As far as we know, the process control tool is designed for satisfying only one control constraint. For example, the continuous sampling plan (CSP) is commonly adopted in process control; various CSPs are presented for meeting only the quality constraint. The process yield index () is proposed to only express the process capability. No process control tool is developed for solving the optimal problem of multiple constraints.

Various CSPs are developed for satisfying the quality requirement and used to improve and control the process quality. The current literature on CSP can be generally classified into three categories. Various CSPs with different inspecting procedures were presented in the first kind of literature. The single level CSP was designated as CSP-1 and was widely adopted for process quality control in manufacturing [1]. To meet different demands in process control, some reduced CSPs were presented with the objective of decreasing the number of units inspected when the probability of nonconformity for the process was very low [25]. Some tightened CSPs have been designed to guarantee that the outgoing quality meets stringent quality requirements stipulated by the customer [68]. Nevertheless, CSPs designed under quality constraint have not taken other constraint, such as cost and risk constraints, into account. The category II literature has investigated the influence of the change of the inspection scheme in CSPs on the inspection cost. From a cost perspective, it was demonstrated that implementing a CSP for a stable production process was inappropriate [9]. Considering the economic objective, the inspection scheme in CSP-1 could work most effectively when the probability of nonconformity was roughly two-thirds of the value of the average outgoing quality limit () [10]. Moreover, the different methods have been proposed for optimizing the parameters of inspection schemes in CSP-1 in a view of cost [1114]. However, there is no agreed conclusion about how to identify the inspection scheme in CSPs whose inspection cost is the minimum. The third kind of literature has proposed the integrated control scheme between CSP and other process control tools, such as preventive maintenance and specification limit [1521]. The integrated schemes were designed with the objective of minimizing the cost function. Nevertheless, no integrating process control scheme is presented for simultaneously meeting the quality and cost constraints by combining the CSP and other process control tools.

The in-control process is commonly regarded as stochastic process. There are two kinds of risk when process control tools are adopted in process control. One risk is the probability of making type I error that an in-control process with good quality is rejected. The other is the probability of making type II error that an in-control process with bad quality is accepted. CSPs have an inherent deficiency that the two risks are high [2225]. The process yield index is an effective performance measure for reflecting the influence of the machining centre drift and process deviation fluctuation on the probability of nonconformity. The index had a one-to-one relationship with the probability of conformity and nonconformity [26]. It has been demonstrated that the natural estimator of was asymptotically normally distributed [27]. The accuracy of the natural estimator has been investigated with a simulation technique [28]. The process yields for some specified cases, such as the imprecise sample data, circular profiles, autocorrelation between linear profiles, and multiple stream processes, have been analyzed in some literature [2932]. In the above researches, the index was used to only reflect the process capability. In recent years, some variable sampling plans based on the process capability indices have been proposed with the objective of building the determination rules for the acceptance or rejection of product lots [3336]. Two risks are simultaneously taken into consideration in the proposed variable sampling plans by utilizing the inference property of the natural estimator . Nevertheless, no literature has been devoted to constructing the risk control strategy with the index under quality and cost constraints for in-line process control.

Distinguished from the objective of minimizing cost in the sampling inspection for lot acceptance decision [34], the in-line process control aims to reach the control goal of minimizing total cost. The total cost constraint restricts the in-constant process to keep constant at right capability level. Thus, the reasonable inspection cost is permitted in process control, which is called cost constraint. The integrated process control scheme needs to be presented with simultaneously considering the quality constraint and the inspection cost constraint. The inspection cost constraint can be translated into the maximum affordable inspected fraction for the in-line process control. In this work, an optimal scheme for process quality and cost control by combining CSP-1 and the index is presented. CSP-1 is adopted in the integrated scheme due to its simplicity and practicability in operation. In the proposed plan, there are four parameters (the clearance number, the sampling fraction, the sampling size, and the critical value of the index ) under the quality and cost constraints. The two parameters (the clearance number and the sampling fraction) in CSP-1 are utilized to guarantee that the average outgoing quality is conforming for the in-control process. The index is used to construct the risk control scheme. The two risks are concurrently controlled at the stipulated level by constructing two nonlinear inequations with the accurate distribution of the estimator .

The rest of this paper is organized as follows. In Section 2, the concept and estimator of the index are introduced. In Section 3, the optimal scheme for process quality and cost control and the operating procedure are presented. The method of identifying the plan parameters is provided. In Section 4, the values of the parameters of the optimal scheme for three different quality constraints are tabulated for practical purposes. Comparisons of the operating characteristic (OC) curves between CSP-1 and the optimal scheme are given to present the advantages of the integrated scheme. In Section 5, an example of application is provided to validate the effectiveness and practicality of the integrated control plan. Finally, Section 6 concludes the paper.

2. Process Fraction Nonconforming and Process Yield Index

The process fraction nonconforming, , is a crucial performance measure for in-line process quality control. For a process that is well controlled, the value of can be taken as a constant. However, the index of is an unknown variable and needs to be estimated. Let be the cumulative distribution function of the quality characteristic interested, so for the in-control process with a two-sided specification limits, where is the upper specification limit and is the lower specification limit. If the quality characteristic follows a normal distribution, we getwhere and are the process mean and the process standard deviation, respectively, and is the of the standard normal distribution, . Unfortunately, there is no literature devoted to a study of the distribution properties of the index of .

Boyles [13] proposed the use of the process yield index, , to obtain an exact measure of the process yield for a process with a normal distribution. There is a one-to-one relationship between and the process yield. The proposed index is defined aswhere is the inverse function of the , , of the standard normal distribution. Let and , where is the middle point of the whole tolerance range, , and is half the tolerance range, . Equation (2) can also be expressed as

The formula for the relationship between and can be obtained from (1) and (2):

Table 1 shows the one-to-one correspondence between process yield, process fraction nonconforming, and process yield index.

The process mean and the process standard deviation are usually unknown variables and need to be estimated using the sample mean and the sample standard deviation , where and . Thus, the estimator of can be written as follows:The estimator is such a complicated function that it is impossible to obtain its exact cumulative distribution function and probability density function. Lee et al. [14] furnished a useful approximation to the distribution of under a normal distribution aswhere is the probability density function of the standard normal distribution andwhere and are defined as functions of and (or and ):

The estimator approximately follows a normal distribution . Thus, the probability density function of can be obtained as

3. The Optimal Scheme for Process Quality and Cost Control

3.1. Quality and Cost Constraints

Two constraints, the average outgoing quality limit () and the inspection capability limit (), are predetermined by the practitioner. is the average fraction inspected. is the cost constraint and represents the maximum affordable inspection workload. The value of is converted from the planned inspection cost. The value of is generally stipulated by the product designer or the customer. For the in-control process, the proportion of nonconformance can be taken as constant. Obviously, there exists a specified in-control process, named limit quality process with quality limit , for which conforming outgoing quality can be achieved only under the inspection capability limit . This means that for the limit quality process with the quality limit . It needs to be noted that generally .

3.2. Determination of Parameters for the Quality Control Scheme in CSP-1

The quality control scheme in CSP-1 should guarantee that the two constraints, and , are simultaneously satisfied when ranges from to . According to the performance formulas in CSP-1 proved by Yang [37], the set of inequalities can be constructed as follows for the quality and cost constraints, respectively,where , , , is the clearance number and only takes positive integer, and is the inspection fraction.

Obviously, all contour schemes can meet inequality (10) when ranges from to . Figure 1 shows the curves of the performance measures and for all contour schemes under the given constraints and , and is the average outgoing quality. The inspection schemes represent the type of schemes with , with , with , is the point where occurs. There are infinite schemes, respectively, included in the two types of the inspection schemes and . The inspection scheme with has only one included.

It can be seen from Figure 1(b) that only the inspection scheme can meet the inequality (11) when . Thus, the inspection scheme is the sole scheme which can simultaneously satisfy the two inequalities (10) and (11), named the optimal scheme.

It can be concluded from Figure 1 that the value of increases gradually to the quality constraint and the inspection workload also increases gradually to the inspection capability limit when the process quality is close to the quality limit for the optimal scheme . The scheme can achieve the conforming outgoing quality with a smaller inspection workload than for an in-control process with and under the inspection capability limit for an in-control process with .

The values of the parameters and cannot be easily achieved with inequalities (10) and (11). Li et al. [38] proposed the formulas to solve the parameters of the specified contour scheme for the specified . Thus, the parameters and can be obtained as follows:where .

Table 2 shows various inspection schemes under three quality constraints and various cost constraints. The values of decrease and the values of increase when the values of the quality limit become greater under the given quality requirement .

In addition, it can be observed from Figure 1(b) that, for the process with , the minimum inspection workload demanded for meeting the quality constraint exceeds the inspection capability limit ; the production should be stopped. Nevertheless, both the probabilities of making the type I and II errors are high when the process is controlled with the contour scheme in CSP-1. The risk control scheme for controlling concurrently the two risks in the optimal scheme should be redesigned under the quality and cost constraints.

3.3. Determination of Parameters for the Risk Control Scheme

The in-control process with should be accepted with a higher probability than ; is the probability of making the type I error that the process with high quality level is rejected. The in-control process with should be rejected with a higher probability than ; is the probability of making the type II error that the process with low quality level is accepted. However, the two types of risks cannot be simultaneously controlled with the contour schemes. Thus, the risk control scheme based on the index is designed under the quality and cost constraints.

There are two key points, and , that need to be considered at the same time in the risk control scheme. The OC curve should pass through the two designated points to meet the two constraints and . Let be the value of the process yield index corresponding to the quality level and let be the value of the process yield index corresponding to the quality level . Therefore, the two key points and for the OC function can be designated as and . It means that if the estimator of for the in-control process is greater than the given value of , the probability of accepting the in-control process will be greater than , and if the estimator of for the in-control process is lower than the fixed value of , the probability of accepting the in-control process will be less than the given value of .

For the quality characteristic following a normal distribution and having a lower specification limit and upper specification limit , the OC function with can be given as

Thus, the two nonlinear inequalities specified by the two risks can be obtained as follows:

The two parameters, the critical value and the sample size , must simultaneously satisfy the two nonlinear inequalities (15) and (16). There are infinite values of the combination which can meet inequalities (15) and (16). The specified value of which can simultaneously satisfy (17) and (18) is the boundary of all the feasible combinations . It means that the combination of meeting (17) and (18) can satisfy inequalities (15) and (16).

The solution for (17) and (18) is sole. For example, under two constraints, and , and two given risks, and , the sole solution can be obtained from (17) and (18). It implies that the value of the estimator is calculated with the sample data. If , the process is judged to be controllable with the current inspection scheme under the quality and cost constraints, and the current inspection scheme will continue. If , the inspection with the inspection scheme will become uneconomic under the given constraints and , and the production should be stopped or the maintenance will be triggered.

3.4. Operation Procedure

The roles of CSP-1 and the index in the optimal scheme are independent and complementary when considering simultaneously the two constraints and for the process quality and cost control. The objective of employing an inspection scheme is to reduce the proportion of nonconformance and achieve the conforming outgoing quality. The combination of is used to control simultaneously the two types of risks and can be regarded as a new stopping rule for CSP-1. The operating procedure for the optimal scheme is as follows.

Step 1 (process quality control). Calculate the value of the parameters under the given values of and . Implement the inspection scheme according to the procedure in CSP-1 for the process with the quality characteristics interested.

Step 2 (process risk control). Calculate the value of the parameters under the given values of and . Keep the latest number of inspection data consecutively in the order of production when the inspection scheme in CSP-1 is performed. Calculate the value of with the latest number of inspection data. The determination is carried out as follows:(i)continue Step 1 if ,(ii)stop production if . where is the threshold used to guarantee that the two risks are controlled at the stipulated level. is the number of the last inspection data recorded consecutively during inspection, including the screening inspection stage and the fraction inspection stage in CSP-1. The number of inspection data is used to calculate the value of .

4. Analyses and Comparisons

In the proposed optimal scheme for process quality and cost control, process quality control can be achieved by performing the inspection scheme , and process risk control can be attained with the combination of . The combination of also plays the role of stopping rule in the inspection scheme . The values of and are different for various values of and for specified constraints and . Tables 35 show the values of the combination of for , and , and , and under three quality requirements, , and three inspection capability limits, and . According to the one-to-one correspondence between , , and , three different process yield limits, and () under (,); , and () under (); and , and () under (), respectively, are considered to examine the behavior of . It can be observed from Tables 35 that the value of the sample size becomes smaller as the or the becomes larger. This phenomenon can be interpreted to mean that if the practitioner reduces the expected values at which high quality processes are rejected and/or low quality processes are accepted, the sample size for the judgement on the quality and capability of the processes will reduce. For a given , , and , the sample size becomes smaller as the process yield limit decreases (the value of becomes smaller). For a fixed , , and , the value of becomes smaller when the value of becomes larger (the value of becomes smaller). We can explain these phenomena by saying that the determination of the quality and capability of the processes can be done easily using a smaller number of inspection data when the difference between the quality limit and the quality constraint becomes larger. For example, for , , and , the required number of inspection data is for and only for .

Figures 24 show the OC curves to depict a comparison of the optimal scheme with other two contour inspection schemes in CSP-1. It can be seen from Figures 24 that, for various given values of the quality constraint and various values of the process quality limit (which represents the cost constraint), the OC curves for the proposed integrated schemes are more ideal than the OC curves for the other two schemes in CSP-1. When and take larger values, for example, when and , the OC curves still have a more ideal shape than the curves for the other two schemes in CSP-1 at a higher yield level of . When and are both given smaller values, for example, and , the OC curves are more ideal than the curves for CSP-1 at various quality limit levels of . The OC curves for the optimal schemes move towards the right when the values of become bigger (the values of become smaller), which shows that the risk control scheme can supply the more rational probabilities of the acceptance and rejection for the quality control scheme in the optimal scheme than the contour scheme in CSP-1.

It can be noted that the inspection workload has not increased in the proposed integrated scheme because the number of inspection data used to calculate the estimator of is recorded during the CSP-1.

5. Example Application

In order to present the way in which the proposed optimal scheme can be applied in practice, the following example taken from a compressor manufacturing enterprise is considered. A cylinder is the key functioning part of an air conditioning compressor. Cylinder thickness is an important dimension for ensuring compressor performance. Based on the quality requirements given by the designer, the tolerance range of the cylinder thickness is set to and the quality requirement is set to . The current inspection scheme, , is adopted in CSP-1 to control the outgoing quality. For using the optimal scheme, the values of the four constraints are specified as , , , and . From Table 3, the optimal scheme can be found as . Using the proposed control scheme, the probability of accepting an in-control process with high quality level (e.g., the nonconforming fraction of the in-control process is lower than the value of ) is greater than . The probability of accepting an in-control process with low quality level (e.g., the value of the index is lower than the value of ) is less than the value of . Performing the quality control scheme , sample items are recorded consecutively, as shown in Table 6. The normal probability plot of the sample items is displayed in Figure 5. Figure 6 shows the histogram of the observed data with the lower and upper specification limits. Obviously, based on the normality test in Figures 5 and 6, the in-control process is shown to be close to a normal distribution.

Carrying out the calculation with the inspection data, we get , , . Obviously, the estimator of is greater than the value of . The optimal scheme which can simultaneously meet the two constraints and will be continued. Table 7 shows a comparison of the performances between the original inspection scheme and the optimal scheme, where represents the probability of acceptance. It can be seen from Table 7 that the performance increases by , decreases by , and the value of the probability of acceptance increases by .

6. Conclusions

An optimal scheme for the process quality and cost control is proposed to monitor the process capability and improve process quality. The CSP-1 and , which play independent and complimentary roles, are integrated in the optimal scheme. The sole feasible inspection scheme in CSP-1 for meeting concurrently the quality and cost constraints is one of the contour schemes in CSP-1, which occurs at the point of . Two types of risk under quality and cost constraints are simultaneously controlled at the stipulated level with the risk control scheme. The risk control scheme is constructed with two nonlinear inequalities based on the accurate distribution of the natural estimator . The combination of the two risk control parameters plays the role of the stopping rule in the inspection scheme . There is a one-to-one correspondence between the values of the four parameters and the given values of the four constraints (quality, cost, and the two risks). The proposed optimal scheme shows the advantages over the original process control tools in the measures of , , and the probability of acceptance.

Data Availability