Table 6

The RPD of five algorithms for large number of jobs.

Algorithm
IGLS1IGLS2IGLS3IGLS4CSA
meanmaxmeanmaxmeanmaxmeanmaxmeanmax

40100.000.000.000.000.000.000.000.000.021.55
150.000.000.000.000.000.000.000.000.021.55
200.000.000.000.000.000.000.000.000.021.55
100.000.020.000.010.000.010.000.020.020.97
150.000.010.000.010.0000.000.010.020.97
200.000.010.000.000.000.010.000.010.020.97
100.020.120.010.040.000.060.020.090.041.51
150.020.090.010.120.010.040.020.100.041.51
200.020.170.010.080.010.040.020.170.041.51

50100.000.000.000.000.000.000.000.000.020.31
150.000.000.000.000.000.000.000.000.020.31
200.000.000.000.000.000.000.000.000.020.31
100.000.320.000.010.000.010.000.020.010.30
150.000.010.000.010.000.000.000.010.010.30
200.000.010.000.010.000.010.000.010.010.30
100.030.280.010.060.010.100.020.230.081.09
150.020.090.010.180.000.040.020.070.081.08
200.020.140.010.280.010.070.010.120.081.08

60100.000.320.000.000.000.000.000.000.020.38
150.000.000.000.000.000.000.000.000.020.38
200.000.000.000.000.000.000.000.000.020.38
100.000.010.000.000.000.000.000.010.020.47
150.000.020.000.000.000.000.000.010.020.47
200.000.010.000.010.000.000.000.010.020.47
100.030.180.010.040.010.090.020.080.081.24
150.020.140.010.050.010.050.020.180.081.24
200.020.110.010.070.010.060.020.110.081.24

70100.000.030.000.000.000.000.000.000.030.35
150.000.000.000.000.000.000.000.000.030.35
200.000.000.000.000.000.000.000.000.030.35
100.000.060.000.000.000.000.000.000.050.6
150.000.020.000.000.000.000.000.010.050.6
200.000.010.000.000.000.000.000.010.050.6
100.030.170.010.080.000.110.020.170.070.74
150.020.140.010.070.010.110.020.110.060.74
200.020.110.010.050.010.100.020.100.060.74

ā€‰ā€‰mean0.010.070.000.030.000.030.010.050.040.79