Research Article

An Automatic Heuristic Design Approach for Seru Scheduling Problem with Resource Conflicts

Table 6

Comparison with basic GP.

Test problem (%)
MinAvgTime

5.5224.73−0.03
4.4920.38−2.31
6.8530.871.53
7.4121.451.18
12.3635.31−1.58
7.1526.692.73
13.2023.21−0.64
7.9336.352.93
8.4924.51−5.31
13.5428.89−3.07
7.5226.841.52
9.7322.731.61
Average gap8.6826.83−0.12