Research Article
Solving the Problem of Time, Cost, and Quality Trade-Off in Project Scheduling under Fuzzy Conditions Using Meta-Heuristic Algorithms
Figure 4
Graph of the average S/N ratio for each level of the int factor of the ABC algorithm in solving the model.