Research Article

Solving the Problem of Time, Cost, and Quality Trade-Off in Project Scheduling under Fuzzy Conditions Using Meta-Heuristic Algorithms

Table 1

Categorized previous study.

Author(s)Reference numberMethod
GT1RobustLP2NLP3GA4Simulation

Lotfi et al.43
Babu and Suresh44
Zhang et al.45
Lotfi et al.51
Abolghasemian et al.52

Note. 1Game theory (GT). 2Linear programming (LP). 3Nonlinear programming (NLP). 4Genetic algorithm (GA).