Table 8

The parameters of reservoir-caprock combination units in Shenhua CCS project [13].

Reservoir numberReservoir thickness 
(m)
Caprock thickness 
(m)
Logging permeability 
(×10−3μm2)
Logging porosity 
(%)
Fracturing pressure 
(MPa)
Formation pressure 
(MPa)

1916992.8110.635.2917.45
25575.4712.437.5317.89
3401911.4319.738.9520.15
48436.5812.942.6021.43
541195.9912.647.0022.94
6261142.73812.543.4723.1
78525.111.946.0323.84
8121780.0395.245.6822.75