Research Article

A Review of the Hydrochemistry of a Deep Sedimentary Aquifer and Its Consequences for Geothermal Operation: Klaipeda, Lithuania

Table 7

Results of phosphonate monitoring (2010), after [9].

Measuring point (Figure 8)T2T2aT12

LocationProduction well 2P, prior to phosphonate dosingProduction well 2P, immediately after phosphonate dosingInjection well 4I, prior to injection
Date16/7/1016/7/1016/7/10
Total phosphate, expressed as PO43-0.132 mg/L3.89 mg/L1.56 mg/L
Orthophosphate as PO43-0.14 mg/L