Research Article

Grouting Treatment of Water and Mud Inrush in Fully Weathered Granite Tunnel: A Case Study

Figure 13

Layout of detection hole. J1~J6 in the figure is the opening position of the inspection hole, and J1~J6 is the final hole position.