Research Article

Integrated Workflow of Geomechanics, Hydraulic Fracturing, and Reservoir Simulation for Production Estimation of a Shale Gas Reservoir

Table 1

DFIT analysis results.

VariablesOffset 1Offset 2Offset 3Offset 4Offset 5Offset 6Offset 7Offset 8

ISIP (MPa)45.0751.3548.5653.3849.9152.5148.4652.47
Closure stress (MPa)35.3436.8436.8639.2738.6437.3436.9139.20
Reservoir pressure (MPa)28.0231.6429.8733.7931.4629.1627.2131.58
Permeability (md)3.7E − 038.9E − 035.2E − 031.9E − 039.9E − 042.9E − 036.0E − 03
PDL coefficient of leakoff (1/kPa)2.3E − 043.6E − 041.5E − 043.0E − 043.2E − 041.2E − 042.1E − 042.7E − 04
Leakoff multiplier (-)2.835.011.993.914.21.712.563.31