Research Article

Researches on the Excavation Disturbance of Shield Tunnel in Sandy Cobble Ground

Figure 11

Excess pore water pressure time history curve at different buried depths of longitudinal lines on both sides of the tunnel: (a) measured values and (b) calculation values.
(a)
(b)