Research Article

Geographic Concerns on Flood Climate and Flood Hydrology in Monsoon-Dominated Damodar River Basin, Eastern India

Table 7

Estimating potential runoff of upper catchment of Damodar River on the basis of selective annual peak discharges at Rhondia for pre-dam and post-dam period.

Date of occurrence 1Peak discharge
in m3 s−1
One-m3 s−1 day in m3Contributing potential runoff
in mm

Pre-dam phase
(1933–1957)
 12/7/193518,112156487680078.56
 6/9/193812,002103697280052.05
 4/8/19397,98969024960034.65
 29/8/19408,77375798720038.05
 10/10/194117,942155018880077.82
 10/8/194210,81193407040046.89
 5/8/19438,38472437760036.36
 18/9/19469,13378909120039.61
 18/8/19509,56182607040041.47
 11/9/195111,01295143680047.76
 26/9/19568,57974122560037.21
Post-dam phase
(1958–2007)
 2/10/19598,79275962880038.13
 3/10/19614,37137765440018.96
 19/9/19674,13835752320017.95
 17/7/19714,55639363840019.76
 13/10/19735,72649472640024.83
 19/9/19765,29745766080022.98
 27/9/197810,91994340160047.36
 28/8/19804,21036374400018.26
 14/9/19874,56739458880019.80
 29/9/19956,52256350080028.28
 25/9/19995,69049161600024.68
 23/9/20006,38755183680027.70
 24/9/20067,03560782400030.51
 25/9/20078,88376749120038.53

Data Source: 1[21].