Research Article

Regression Analysis of Bond Parameters between Corroded Rebar and Concrete Based on Reported Test Data

Table 3

Parameters of beam-end specimens.

References No.Specimen size (mm)Corrosion level (%)
(MPa)

(mm)

(mm)
No. of specimens
(mm)
Stirrup confinementReinforcement positionTest environmentReinforcement type

[3]150×150×11400.47–6.0522.1312-17360/100YesBottomDirect currentPlain bars
[6]150×240×5600–15.8862.716, 12503910dYesBottomCurrent density of 250uA/cm2Ribbed bars, plain bars
[10]150×240×12600–4.63-20506200YesBottomWetting-drying cycleRibbed bars
[23]200×120×9800–10.0430183010140YesBottomWetting-drying cycleRibbed bars
[30]125×160×10000.095–12.47-122517384/190YesBottomDirect currentRibbed bars
[37]150×250×12000–2033204016150YesBottomWet-current density of 400uA/cm2Ribbed bars
[41]150×250×360Crack width control2016256160YesBottomDirect currentRibbed bars
[42]150×240×12600–4.638.320506200YesBottomWetting-drying cycle 100mARibbed bars
[43]150×240×12600–17.14130, 40, 5016, 20, 2515, 20, 253610dYesBottomAccelerated corrosionRibbed bars
[44]150×250×3200–42516306120YesBottomAccelerated corrosionRibbed bars
[45]200×300×3800–12-12, 16-9300Each halfBottomCurrent density of 200uA/cm2Ribbed bars
[46]100×100×4000–12.7332.812-1960NoBottomWetting-drying cycle current densityRibbed bars
[47]100×100×4000–12.7332.812-1960NoBottomWetting-drying cycle current densityRibbed bars
[48]150×250×12000–20.8630204018150YesBottomCurrent density of400uA/cm2Ribbed bars
[49]203×457×24400–1033, 3525-102400YesBottomDirect current (2.5–10 A)Ribbed bars
[50]100×150×11000–54510207100NoBottomCurrent density of 800uA/cm2Ribbed bars
[51]150×240×6000–10.2836, 44.6, 52.72030, 502410dYesBottomWet-current density of 250uA/cm2Ribbed bars
[52]150×240×6000–2.0636, 44.6, 52.72030, 50810dYesBottomWet-current density of 250uA/cm2Ribbed bars