Simulation of the Westinghouse AP1000 Response to SBLOCA Using RELAP/SCDAPSIM
Table 2
Set points for SBLOCA.
| Event | Set point |
| Reactor trip on low pressurizer pressure | 12.41 MPa | Reactor trip on low-low pressurizer pressure | 11.72 MPa | ‘‘S’’ signal on low-low pressurizer pressure | After reactor trip signal | PRHR isolation valve starts to open | After “S” signal | CMTs injection starts | After ‘‘S’’ signal | ACC injection starts on low RCS pressure | 4.83 MPa | ADS-1 control valve trip signal | 20 s after 67.5% liquid volume fraction in CMT | ADS-2 control valve trip signal | 70 s after ADS-1 actuation | ADS-3 control valve trip signal | 120 s after ADS-2 actuation | ADS-4A starts to open | 20.0% liquid volume fraction in CMT and 120 s after ADS-3 actuation | ADS-4B starts to open | 60 s after ADS-4A actuation | IRWST injection starts RCS pressure | RCS pressure less than 0.18 MPa |
|
|