Research Article

Economical Feasibility of Utilizing Photovoltaics for Water Pumping in Saudi Arabia

Table 5

Summary of greenhouse gases avoided as a result of PV power utilization for water pumping in Saudi Arabia at different locations.

LocationGHG (tCO2)/yearGasoline saved (L/year)During life time of the plant
(tCO2)L

Dhahran3.31,42082.535,500
Riyadh3.41,45185.036,275
Jeddah3.41,46285.036,550
Guriat3.41,45285.036,300
Nejran4.01,704100.042,600

Average3.51,49887.537,445