Research Article

Enhanced Particle Swarm Optimization-Based Feeder Reconfiguration Considering Uncertain Large Photovoltaic Powers and Demands

Table 4

Optimal results before feeder reconfiguration.

Scenario12345678

Voltage magnitude (p.u.)
 V11.0411.0431.0391.0451.0261.0470.9741.019
 V131.0211.0341.0151.0211.0061.0200.9500.991
 V261.0501.0501.0501.0501.0501.0500.9841.050
 V441.0151.0101.0081.0121.0061.0091.0241.014
 V611.0491.0000.9800.9741.0501.0351.0091.014
 V701.0501.0501.0501.0501.0471.0501.0501.050
Reactive power (kVAr)
 Q13109.684185.96381.79282.203111.29754.8470.00256.510
 Q26207.808209.497206.809206.289209.705204.487−361.796207.732
 Q44130.07256.78333.83587.80749.37755.037502.178105.918
 Q61941.614545.250392.784345.034819.679832.136954.342657.163
Real power at swing bus (kW)
 P1361.171304.607375.732473.12291.277557.162−95.09250.501
 P701953.5262640.7012912.2822902.0691877.8192241.5012800.6332410.641
Total load (kW)4286.6794276.3044285.4464281.4814280.0264281.2644278.7224279.626
Loss (kW)117.429148.208182.827184.226135.961129.235193.034153.292
Aggregating loss = 157.874 kW