Research Article

Technoeconomical Assessment of Optimum Design for Photovoltaic Water Pumping System for Rural Area in Oman

Table 5

Diesel system results for 0.38 USD/Litre.

Label
(kW)
Initial
capital
Operating
cost ($/yr)
Total
NPC
COE
($/kWh)
Ren.
frac.
Capacity
shortage
Diesel
(L)
Label
(hrs)

1.0$ 1,000562$ 8,1850.7900.000.003511,825