Research Article
Heuristic Storage System Sizing for Optimal Operation of Electric Vehicles Powered by Photovoltaic Charging Station
Table 2
Results of the statistical assessment of active power in PV and CSP in winter and spring.
| Spring day | A day | An average day | PV | CSP | PV | CSP |
| Measurement values per day | 86,400 | 86,400 | 86,400 | 86,400 | Installed power in kW | 116.6 | 110.8 | 116.6 | 110.8 | Arithmetic average in kW | 16.86 | 5.41 | 23.46 | 3.97 | Standard deviation in kW | 25.28 | 11.23 | 28.13 | 7.65 | Variance in kW2 | 639.23 | 126.06 | 791.32 | 58.58 | Maximum power in kW | 100.61 | 54.41 | 85.27 | 41.12 | Minimum power in kW | 0.00 | 0.23 | 0.00 | 0.23 | Maximum in kW/s | 33.08 | 12.92 | 6.62 | 3.02 | Energy in kWh | 404.72 | 129.85 | 563.11 | 95.18 | Energy relation based on load | 3.12 | 1.00 | 5.92 | 1.00 |
| Winter day | A day | An average day | PV | CSP | PV | CSP |
| Measurement values per day | 86,400 | 86,400 | 86,400 | 86,400 | Installed power in kW | 116.6 | 110.8 | 116.6 | 110.8 | Arithmetic average in kW | 2.84 | 5.70 | 1.29 | 3.58 | Standard deviation in kW | 5.90 | 8.69 | 2.36 | 4.69 | Variance in kW2 | 34.80 | 75.52 | 5.59 | 22.00 | Maximum power in kW | 51.94 | 43.37 | 12.97 | 25.41 | Minimum power in kW | 0.00 | 0.41 | 0.00 | 0.46 | Maximum in kW/s | 5.77 | 6.17 | 1.15 | 1.98 | Energy in kWh | 68.26 | 136.88 | 30.89 | 85.88 | Energy relation based on load | 0.50 | 1.00 | 0.36 | 1.00 |
|
|