Research Article

Technoeconomic Evaluation for an Installed Small-Scale Photovoltaic Power Plant

Table 5

Assumption of various interest rates used in the economic feasibility [25].

Item descriptionValue

Interest rate (TL)10.79%
Inflation rate (TL)2.96%
Discount rate (TL)7.6%
Photovoltaic panel yield loss8%
Project life25 years