Research Article

Evaluation of Energy Production and Energy Yield Assessment Based on Feasibility, Design, and Execution of 3 × 50 MW Grid-Connected Solar PV Pilot Project in Nooriabad

Table 9

Monthly average output based on manual calculation.

MonthColl. plan kWh/m2·dayAverage monthly output (ten thousand kW)

January5.742137.95
February5.691914.23
March6.142286.94
April6.062184.33
May5.862182.64
June5.782083.40
July4.881817.63
August4.931836.25
September6.012166.30
October6.202309.28
November5.932137.47
December5.141914.47

Total5.7024970.89