Research Article

Optimal Sizing and Analysis of a Small Hybrid Power System for Umuokpo Amumara in Eastern Nigeria

Table 3

Electrical load for public installations.

InstallationElectrical featuresLoad rating (W)Hours of operationEnergy (Wh/day)

Schools (2)( bulbs) + ( bulbs)1,36068,160
Churches (3)( bulbs)3,000436,000
Town hall bulbs2403720
Small shops (20) bulbs1,2001214,400
Village water pumping system (1)1,500 W1,50023,000
Total7,30062,280