Research Article

Optimal Sizing and Analysis of a Small Hybrid Power System for Umuokpo Amumara in Eastern Nigeria

Table 8

Comparison of the optimal and nonoptimal systems from HOMER.

ItemOptimal systemConfiguration 2Configuration 1

PV capacity (kW)2,750
Diesel gen. capacity1,0001,5001,500
Number of batteries15,0002,500
Gen. operating hours9598,7602,929
Inverter capacity1,5001,000
Total cost $54,496,420422,842,560156,293,280