Alternative design for 31.5 kWp BAPV system in E6+E8 Buildings.
| Alternative | Type of PV | Number of PV | Weight of PV | Price of PV | Covered area | PR | Energy spent to load | Total energy 25 years | Grid feed-in | LCC | LCOE | Reduction CO2 | PV | Grid | (unit) | (kg) | $ | m2 | (%) | (%) | (%) | (MWh/25 years) | (%) | ($) | ($) | (kg/year) |
| 1 | HIT | 126 | 1890 | $239 | 158.9 | 72.3 | 74.69 | 25.31 | 996.43 | 59.1 | $104.302 | $0.105 | 35.28 | 2 | CdTe | 75 | 2700 | $445 | 185.6 | 74.8 | 75.54 | 24.46 | 1,023.0 | 59.9 | $125.001 | $0.122 | 36,373 | 3 | CIS | 180 | 3600 | $162 | 221.1 | 75.3 | 75.30 | 24.70 | 1,040.9 | 60.3 | $136.095 | $0.131 | 36,648 | 4 | Mono | 90 | 1674 | $320 | 146.7 | 75.9 | 75.90 | 24.10 | 1,055.4 | 60.3 | $98.108 | $0.093 | 36.929 | 5 | Poly | 126 | 2394 | $243 | 205.0 | 71.2 | 74.82 | 25.18 | 954.81 | 58.8 | $114.865 | $0.120 | 35,087 |
|
|