Analyzing the Off-Grid Performance of the Hybrid Photovoltaic/Diesel Energy System for a Peripheral Village
| Component | Quantity | Unit cost (Apx.) |
| Cost of 11 kV line from 33 kV grid point | 25 km | $3870/km | Transformer setup cost, 11 kVA | 2 | $925 | Distribution lines | | $4620/transformer | Number of households | 108 | | Total number of productive and commercial loads (Apx.) | 10 | | Cost of distribution for each household, fixture, internal wiring, etc. | | 30$/connection | Annual operation and maintenance costs | | 2.5% of the total capital cost |
|
|