Research Article

Active Power Management for PV Systems under High Penetration Scenario

Figure 2

Voltage levels on the transformer and residences: (a) residences demanding power (-4.4 A), (b) residences injecting power (4.4 A), and (c) residences injecting power (8.8 A).
(a)
(b)
(c)