Research Article
Optimal Operation of Biomass Gasifier Based Hybrid Energy System
Table 4
Economic detail of the proposed wind generator (4 numbers × 30 kW each).
| Capital | 12,000,000 ($270,880.36) | Operation and maintenance | 4,587,971 ($103,565.94) | Total | 16,587,972 ($374446.3) |
|
|