Table of Contents
ISRN Operations Research
Volume 2013, Article ID 485172, 8 pages
http://dx.doi.org/10.1155/2013/485172
Research Article

EPQ Model for Trended Demand with Rework and Random Preventive Machine Time

1Department of Mathematics, Gujarat University, Ahmedabad, Gujarat 380009, India
2Department of Mathematics, Government Polytechnic for Girls, Ahmedabad, Gujarat 380015, India
3Department of Mathematics, L.D. College of Engineering, Ahmedabad, Gujarat 380015, India

Received 20 April 2013; Accepted 9 June 2013

Academic Editors: I. Ahmad, P. Ekel, and Y. Yu

Copyright © 2013 Nita H. Shah et al. This is an open access article distributed under the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.

Linked References

  1. D. A. Schrady, “A deterministic inventory model for repairable items,” Naval Research Logistics, vol. 14, no. 3, pp. 391–398, 1967. View at Publisher · View at Google Scholar
  2. M. Khouja, “The economic lot and delivery scheduling problem: common cycle, rework, and variable production rate,” IIE Transactions, vol. 32, no. 8, pp. 715–725, 2000. View at Google Scholar · View at Scopus
  3. S.-G. Koh, H. Hwang, K.-I. Sohn, and C.-S. Ko, “An optimal ordering and recovery policy for reusable items,” Computers and Industrial Engineering, vol. 43, no. 1-2, pp. 59–73, 2002. View at Publisher · View at Google Scholar · View at Scopus
  4. I. Dobos and K. Richter, “An extended production/recycling model with stationary demand and return rates,” International Journal of Production Economics, vol. 90, no. 3, pp. 311–323, 2004. View at Publisher · View at Google Scholar · View at Scopus
  5. S. W. Chiu, D.-C. Gong, and H.-M. Wee, “Effects of random defective rate and imperfect rework process on economic production quantity model,” Japan Journal of Industrial and Applied Mathematics, vol. 21, no. 3, pp. 375–389, 2004. View at Google Scholar · View at Scopus
  6. A. M. M. Jamal, B. R. Sarker, and S. Mondal, “Optimal manufacturing batch size with rework process at a single-stage production system,” Computers and Industrial Engineering, vol. 47, no. 1, pp. 77–89, 2004. View at Publisher · View at Google Scholar · View at Scopus
  7. L. E. Cárdenas-Barrón, “On optimal batch sizing in a multi-stage production system with rework consideration,” European Journal of Operational Research, vol. 196, no. 3, pp. 1238–1244, 2009. View at Publisher · View at Google Scholar · View at Scopus
  8. G. A. Widyadana and H. M. Wee, “Revisiting lot sizing for an inventory system with product recovery,” Computers and Mathematics with Applications, vol. 59, no. 8, pp. 2933–2939, 2010. View at Publisher · View at Google Scholar · View at Scopus
  9. S. W. Chiu, “Optimal replenishment policy for imperfect quality EMQ model with rework and backlogging,” Applied Stochastic Models in Business and Industry, vol. 23, no. 2, pp. 165–178, 2007. View at Publisher · View at Google Scholar · View at Scopus
  10. S. W. Chiu, C.-K. Ting, and Y.-S. P. Chiu, “Optimal production lot sizing with rework, scrap rate, and service level constraint,” Mathematical and Computer Modelling, vol. 46, no. 3-4, pp. 535–549, 2007. View at Publisher · View at Google Scholar · View at Scopus
  11. S. H. Yoo, D. Kim, and M.-S. Park, “Economic production quantity model with imperfect-quality items, two-way imperfect inspection and sales return,” International Journal of Production Economics, vol. 121, no. 1, pp. 255–265, 2009. View at Publisher · View at Google Scholar · View at Scopus
  12. R. D. Meller and D. S. Kim, “The impact of preventive maintenance on system cost and buffer size,” European Journal of Operational Research, vol. 95, no. 3, pp. 577–591, 1996. View at Publisher · View at Google Scholar · View at Scopus
  13. S.-H. Sheu and J.-A. Chen, “Optimal lot-sizing problem with imperfect maintenance and imperfect production,” International Journal of Systems Science, vol. 35, no. 1, pp. 69–77, 2004. View at Publisher · View at Google Scholar · View at Scopus
  14. J.-C. Tsou and W.-J. Chen, “The impact of preventive activities on the economics of production systems: modeling and application,” Applied Mathematical Modelling, vol. 32, no. 6, pp. 1056–1065, 2008. View at Publisher · View at Google Scholar · View at Scopus
  15. N. E. Abboud, M. Y. Jaber, and N. A. Noueihed, “Economic lot sizing with the consideration of random machine unavailability time,” Computers and Operations Research, vol. 27, no. 4, pp. 335–351, 2000. View at Publisher · View at Google Scholar · View at Scopus
  16. C.-J. Chung, G. A. Widyadana, and H. M. Wee, “Economic production quantity model for deteriorating inventory with random machine unavailability and shortage,” International Journal of Production Research, vol. 49, no. 3, pp. 883–902, 2011. View at Publisher · View at Google Scholar · View at Scopus
  17. H. M. Wee and G. A. Widyadana, “Economic production quantity models of deteriorating items with rework and stochastic preventive maintenance time,” International Journal of Production Research, vol. 50, no. 11, pp. 2940–2952, 2012. View at Publisher · View at Google Scholar