Review Article
Business Process Management: A Comprehensive Survey
Table 3
Relation between the twenty use cases and six key concerns (+ = related and ++ = strongly related).
| Use case | Process modeling languages | Process enactment infrastructures | Process model analysis | Process mining | Process flexibility | Process reuse |
| Design model (DesM) | ++ | | + | | + | | Discover model from event data (DiscM) | | | | ++ | | | Select model from collection (SelM) | | | | | | ++ | Merge models (MerM) | | | | | | ++ | Compose model (CompM) | | | | | | + | Design configurable model (DesCM) | + | | | | | ++ | Merge models into configurable model (MerCM) | | | | | | ++ | Configure configurable model (ConCM) | | | | | | ++ | Refine model (RefM) | + | + | | | | + | Enact model (EnM) | + | ++ | | | + | | Log event data (LogED) | | + | | ++ | | | Monitor (Mon) | | + | | + | | | Adapt while running (AdaWR) | | + | | | ++ | | Analyze performance based on model (PerfM) | | | ++ | | | | Verify model (VerM) | | | ++ | | | + | Check conformance using event data (ConfED) | | | | ++ | | | Analyze performance using event data (PerfED) | | | | ++ | | | Repair model (RepM) | | | | ++ | | | Extend model (ExtM) | | | | ++ | | | Improve model (ImpM) | | | ++ | + | | |
|
|