Research Article

The Optimal Dispatch of Traffic and Patrol Police Service Platforms

Table 2

The optimal dispatch project of TPPSP with = 5 min.

Dispatching projectPath of choosing projectTime from the ith TPPSP to the jth intersection

1–38 1-69-70-2-40-39-38 5.880900
2–16 2-40-39-38-16 7.388100
4–48 4-57-58-59-51-50-5-47-48 7.395900
5–30 5-47-48-30 3.182900
7–29 7-30-29 8.015500
10–12 10-26-27-12 7.586600
11–24 11-25-24 3.805300
12–22 12-25-24-13-22 6.882500
13–23 13-23 0.500000
14–21 14-21 3.265000
15–28 15-28 4.751800
16–14 16-14 6.741700
18–62 18-80-79-19-77-76-64-63-4-62 6.734400