Research Article

Link-Based Signalized Arterial Progression Optimization with Practical Travel Speed

Table 6

Optimized results for on Kietzke Lane ( , Vassar Street and Plumb Lane).

Timing parameterValid solutions
123456789101112

241223414123
333143114422
988382807865636261605854
1.00.850.840.820.800.630.640.630.620.610.590.55
818181818181818181818186