Research Article
Link-Based Signalized Arterial Progression Optimization with Practical Travel Speed
Table 8
Phase splits in the initial signal timing plan of Kietzke Lane (2nd Street → Peckham Lane).
| INTID | SBL | NBT | WBL | EBT | NBL | SBT | EBL | WBT | Distance (ft) |
| 1 | 18 | 51 | 20 | 41 | 20 | 49 | 30 | 31 | | 2 | 20 | 45 | 25 | 40 | 29 | 36 | 25 | 40 | 2015 | 3 | 18 | 54 | 23 | 35 | 17 | 55 | 18 | 40 | 3294 | 4 | 22 | 48 | 18 | 42 | 20 | 50 | 22 | 38 | 2600 | 5 | 16 | 79 | — | 35 | 16 | 79 | — | 35 | 1841 | 6 | 15 | 80 | — | 35 | 18 | 77 | — | — | 2180 | 7 | 22 | 40 | 20 | 48 | 18 | 44 | 19 | 49 | 724 | 8 | 36 | 41 | 21 | 32 | 16 | 61 | 19 | 34 | 2168 |
|
|