Research Article
Hydraulic Transients Induced by Pigging Operation in Pipeline with a Long Slope
Table 4
Summary of the field trial and numerical simulation.
| | The field trial | Numerical simulation |
| Number of compressor | 1 | 1 | Total time of pigging process | 36 Hours | 35.5 Hours | Value of the impulse pressure | 1.576 MPa | 1.51 MPa | Bursting pressure | 20.83 MPa | 20.83 MPa |
|
|