Research Article
Determination of Pavement Rehabilitation Activities through a Permutation Algorithm
Table 1
Costs of the rehabilitation overlays.
| Rehabilitation method | Modified asphalt overlay of 15 cm | Modified asphalt overlay of 10 cm | Modified asphalt overlay of 5 cm | General asphalt overlay of 5 cm |
| Cost (million won/are*) | 5.6 | 4.2 | 2.5 | 2.2 |
|
|
Are is 100 m2.
|