Research Article

Comparative Study on Interface Elements, Thin-Layer Elements, and Contact Analysis Methods in the Analysis of High Concrete-Faced Rockfill Dams

Figure 12

Separation of the slab from the cushion layer at different stages (contact analysis method).
320890.fig.0012a
(a) Separation of the stage-I slab
320890.fig.0012b
(b) Separation of the stage-II slab