Research Article

Impact of DG Configuration on Maximum Use of Load Supply Capability in Distribution Power Systems

Table 5

Comparison between direct and indirect load transfer.

LSC expectation
MVA
Direct load transferIndirect load transfer
90.3599101.143
Tran.Loading factor
expectation (%)
Loading factor
standard deviation (%)
Loading factor
expectation (%)
Loading factor
standard deviation (%)

155.750.9769.890.31
247.160.8463.020.39
377.530.1869.90.30
472.470.1875.530.38
5646.4672.180.25
655.750.9772.180.00