Research Article

Impact of DG Configuration on Maximum Use of Load Supply Capability in Distribution Power Systems

Table 6

The LSC with different DG sites.

ā€‰Access to tran. 1Basic caseAccess to tran. 3Access to tran. 6

LSC expectation101.82101.14100.53101.12
MVA
LSC standard deviation0.330.140.040.23
MVA
(LSC ā‰¤ ) = 80%101.45100.91100.32100.87
MVA