Research Article

Multiobjective Fuzzy Mixed Assembly Line Sequencing Optimization Model

Table 5

Summary of the final results based on existing and optimized data.

ā€‰Existing dataOptimized data
ā€‰(Opt, Med, Pes)(Opt, Med, Pes)

Total scheduling time(166, 250, 266)(62.5, 73, 88.5)
Total setup number (No.)(44, 44, 44)(36, 36, 39)
Total efficient frontier(105, 147, 155)(49.25, 54.5, 63.75)
Total scheduling time with setup time(254, 338, 354)(135, 145, 168)
Total operation setup time(88, 88, 88)(72, 72, 78)
Total changing setup cost ($)(3520, 3520, 3520)(2880, 2880, 3120)
Total units produced per day(2.89, 1.92, 1.80)(7.62, 6.58, 5.33)
Total efficiency (%)(11.45%, 10.32%, 10.90%)(30.16%, 35.34%, 32.22%)
Total idle time (%)(88.55%, 89.68%, 89.10%)(69.84%, 64.66%, 67.78%)