Research Article
A Strategic Planning Methodology for the Multimodal Transportation Systems: A Case Study from Turkey
Table 13
Unloading, warehousing, and loading times in the second transshipment terminals (hours/container).
| | Marport (Ambarlı, İstanbul) | Gemlik Port (Bursa) | Akport (Tekirdağ) | Planned port for LSP | Haydarpaşa Port (Istanbul) |
| Unloading cost of products transported by railway | No transportation | 12 | Unloading cost of products transported by sea | 1 | 1 | 1 | 0.7 | 2 |
| Waiting cost of products transported by railway | No transportation | 48 | Waiting cost of products transported by sea | 48 | 48 | 72 | 50.4 | 72 |
| Loading cost of products for railway transport | No transportation | 3 | Loading cost of products for road transport | 2 | 3 | 3 | 2.1 | 4 |
|
|