Research Article

A New Method for Predicting the Position of Gas Influx Based on PRP in Drilling Operations

Table 2

Predicted position of gas influx during MPD operations.

Receive data from IPCTest result (m)
BP (MPa)Drilling mud
flow (L/s)
Gas flow (L/s)Time difference (s)

0.073823.6310.253081
0.113725.1211.253162
0.153815.298.752925
0.25455.767.253286
0.274100No gas influx
0.353700No gas influx
0.514600No gas influx
0.613900No gas influx