Research Article

Metaheuristic Approaches for Hydropower System Scheduling

Table 5

Results from the case study of day 02/11/2012.

SolutionJupiá (Frame I)Porto Primavera (Frame II)
GA + SPEAGA + ACOGA + SPEAGA + ACO
#
on-off
Generation
(MW)
#
on-off
Generation
(MW)
#
on-off
Generation
(MW)
#
on-off
Generation
(MW)

1232,512.59231,770.43033,774.55032,168.20
2332,626.50332,247.92233,777.07232,219.96
3432,970.51532,324.27433,313.23
4532,976.89