Research Article
Metaheuristic Approaches for Hydropower System Scheduling
Table 5
Results from the case study of day 02/11/2012.
| Solution | Jupiá (Frame I) | Porto Primavera (Frame II) | GA + SPEA | GA + ACO | GA + SPEA | GA + ACO | # on-off | Generation (MW) | # on-off | Generation (MW) | # on-off | Generation (MW) | # on-off | Generation (MW) |
| 1 | 2 | 32,512.59 | 2 | 31,770.43 | 0 | 33,774.55 | 0 | 32,168.20 | 2 | 3 | 32,626.50 | 3 | 32,247.92 | 2 | 33,777.07 | 2 | 32,219.96 | 3 | 4 | 32,970.51 | 5 | 32,324.27 | — | — | 4 | 33,313.23 | 4 | 5 | 32,976.89 | — | — | — | — | — | — |
|
|