Research Article

Metaheuristic Approaches for Hydropower System Scheduling

Table 6

Results from the case study of day 01/16/2013.

SolutionJupiá (Frame III)Porto Primavera (Frame IV)
GA + SPEAGA + ACOGA + SPEAGA + ACO
#
on-off
Generation
(MW)
#
on-off
Generation
(MW)
#
on-off
Generation
(MW)
#
on-off
Generation
(MW)

11031,949.96530,212.20036,426.65035,147.76
21231,978.13630,463.18235,187.10
31431,986.00930,528.50
41030,819.07