Research Article
Metaheuristic Approaches for Hydropower System Scheduling
Table 6
Results from the case study of day 01/16/2013.
| Solution | Jupiá (Frame III) | Porto Primavera (Frame IV) | GA + SPEA | GA + ACO | GA + SPEA | GA + ACO | # on-off | Generation (MW) | # on-off | Generation (MW) | # on-off | Generation (MW) | # on-off | Generation (MW) |
| 1 | 10 | 31,949.96 | 5 | 30,212.20 | 0 | 36,426.65 | 0 | 35,147.76 | 2 | 12 | 31,978.13 | 6 | 30,463.18 | — | — | 2 | 35,187.10 | 3 | 14 | 31,986.00 | 9 | 30,528.50 | — | — | | — | 4 | — | — | 10 | 30,819.07 | | | | |
|
|