Research Article

A Novel Space-Time-Speed Method for Increasing the Passing Capacity with Safety Guaranteed of Railway Station

Table 4

The space triggering time of downward positive route for receiving trains of Shaoguan station.

Train speed
v (km/h)
The length of fixed approach sectionThe length of variable approach section Trigger time for fixed
approach section (the corresponding number of blocking sections)
Trigger time for variable approach section (the corresponding number of blocking sections)

230~26984158
27084159
271~307851510
308~333861511
334~340861512
341~350871513