Research Article
A Simheuristic Method for the Reversible Lanes Allocation and Scheduling Problem at Smart Container Terminal Gate
Table 4
Selection of the cost coefficients.
| Group number | Cost coefficients which are changed | Change to times of the control group |
| | , , , | 0.5 | | , , , | 1.5 | | , , , | 2 | | , , | 0.5 | | , , | 1.5 | | , , | 2 |
|
|