Research Article

A Simheuristic Method for the Reversible Lanes Allocation and Scheduling Problem at Smart Container Terminal Gate

Table 5

Total costs and their variation corresponding to each group.

Group numberOptimal total costs (Yuan)Variation of total costs compared with the control group (%)Optimal decision group

Control group2,235,0700
1,496,720āˆ’33.0
2,973,42133.0
3,711,77166.0
1,937,230āˆ’13.3
2,532,91013.3
2,805,69625.5