Research Article
Optimizing High-Speed Railroad Timetable with Passenger and Station Service Demands: A Case Study in the Wuhan-Guangzhou Corridor
Table 6
Comparison between the real train timetable and the optimized train timetable.
| Parameters | Real Case | Optimal Case | Change | Percent Change (%) |
| Number of trains | 107 | 107 | 0 | 0 | Average travel speed (km/h) | 223.4 | 234.1 | 10.7 | 4.8 | Average number of stops | 4.4 | 3.5 | -0.9 | -20.3 | Average dwell time (min) | 12.5 | 7.1 | -5 | -43.2 | Overtaking | 40 | 0 | -40 | -100.0 | Max dwell time (min) | 28 | 6 | -22 | -78.6 | Total cost of trains | 5902.5 | 3645.7 | -2257 | -38.2 | Average cost of trains | 55.2 | 34.1 | -21 | -38.2 | UB | — | 3645.7 | — | — | LB | — | 3576 | — | — | Computation time (s) | — | 199.0 | — | — | Gap | — | 1.9% | — | — |
|
|