Research Article
Road Maintenance Optimization Model Based on Dynamic Programming in Urban Traffic Network
Table 2
Feasible solutions of the first stage of the optimal maintenance scheme.
| | | Order | Link | Cost | Order | Link | Cost |
| 1 | (9-10) | 9.6664E+03 | 1 | (10-11) | 1.0548E+04 | 2 | (10-11) | 1.0548E+04 | 2 | (12-8) | 1.7192E+04 | 3 | (12-8) | 1.7192E+04 | 3 | (5-9) | 2.4606E+04 | 4 | (5-9) | 2.4606E+04 | 4 | (7-8) | 2.8514E+04 | 5 | (7-8) | 2.8514E+04 | | | |
| | Order | Link | Cost | Order | Link | Cost |
| 1 | (7-8,12-8) | 1.0110E+04 | 6 | (5-9, 12-8) | 1.7224E+04 | 2 | (9-10, 10-11) | 1.0548E+04 | 7 | (9-10, 12-8) | 2.1207E+04 | 3 | (5-9, 9-10) | 1.2044E+04 | 8 | (7-8, 9-10) | 2.5950E+04 | 4 | (12-8, 10-11) | 1.6357E+04 | 9 | (5-9, 7-8) | 3.7239E+04 | 5 | (5-9, 10-11) | 1.6828E+04 | 10 | (7-8, 10-11) | 4.7624E+04 |
|
|