Research Article

A Simulation-Based Dynamic Programming Method for Interchange Scheduling of Port Collecting and Distributing Network

Table 7

Comparative analysis of results of two methods.

Vehicle TypeTraditional methodA Simulation-based DP Method
Average delay time(s)Total delay time(s)Average delay time(s)Total delay time(s)
1#2#3#4#1#2#3#4#

Urban Vehicles33.419.931.739.21923635.716.419.711.619.11385990.4
Drayage Trucks21.622.434.932.72137629.918.933.215.713.41096014.4
All Vehicles30.921.533.736.5——17.326.913.614.7——