Research Article
Tram-Oriented Traffic Signal Timing Resynchronization
Table 4
A summary of three scenarios.
| ā | Scenario 1 | Scenario 2 | Scenario 3 |
| Tram travel time (s) | 520.0 | 459.2 [-11%] | 413.3[-20%] | Vehicle travel time (s) | 439.8 | 435.4 [-1.0%] | 438.9[-0.2%] | Vehicle delay on Guyang (s) | 33.8 | 34.5 [+2%] | 34.2[+1%] | Vehicle delay on Husong (s) | 35.0 | 37.5[+7%] | 37.1[+6%] | Vehicle delay on Fangta (s) | 28.3 | 33.6[+19%] | 30.5[+8%] | Vehicle delay on Songdong (s) | 36.2 | 36.2[+0%] | 35.1[-3%] |
|
|