Research Article

Transfer Robustness Optimization for Urban Rail Transit Timetables

Table 2

Total EETC, App_EETC, and PMTP for different buffer schemes.

SchemeRobTRobT-Sk%-ProT
k=0k=5k=10k=15k=20

EETC (107 s)3.4324.4586.2874.4684.1924.5695.131
App_EETC (107 s)3.6015.364
PMTP2.311%3.375%17.423%12.572%5.875%5.004%0.820%