Optimal timetable of the test segment without disturbance.

SectionSpacing [m]Train No.Dwell time/ headway [s]Accelerating time [s]Cruising time [s]Braking time [s]Cruising speed [m/s]

Xinzhuang to waihuan road1458.51026.543.019.521.36
212020.161.416.318

Waihuan road to lianhua road1125.712027.325.819.921.72
22020.143.016.318

Lianhua road to jingjiang park979.112026.919.819.721.52
22020.134.916.318

Jingjiang park to south shanghai railway station1377.312025.541.71920.88
22020.156.916.318

South shanghai railway station to caobao road1526.812020.165.216.318
22020.165.216.318.04

Caobao road to shanghai indoor stadium961.212020.134.11618
22024.623.618.320.4