Research Article
A Real-Time Timetable Rescheduling Method for Metro System Energy Optimization under Dwell-Time Disturbances
Table 1
Optimal timetable of the test segment without disturbance.
| Section | Spacing [m] | Train No. | Dwell time/ headway [s] | Accelerating time [s] | Cruising time [s] | Braking time [s] | Cruising speed [m/s] |
| Xinzhuang to waihuan road | 1458.5 | 1 | 0 | 26.5 | 43.0 | 19.5 | 21.36 | 2 | 120 | 20.1 | 61.4 | 16.3 | 18 |
| Waihuan road to lianhua road | 1125.7 | 1 | 20 | 27.3 | 25.8 | 19.9 | 21.72 | 2 | 20 | 20.1 | 43.0 | 16.3 | 18 |
| Lianhua road to jingjiang park | 979.1 | 1 | 20 | 26.9 | 19.8 | 19.7 | 21.52 | 2 | 20 | 20.1 | 34.9 | 16.3 | 18 |
| Jingjiang park to south shanghai railway station | 1377.3 | 1 | 20 | 25.5 | 41.7 | 19 | 20.88 | 2 | 20 | 20.1 | 56.9 | 16.3 | 18 |
| South shanghai railway station to caobao road | 1526.8 | 1 | 20 | 20.1 | 65.2 | 16.3 | 18 | 2 | 20 | 20.1 | 65.2 | 16.3 | 18.04 |
| Caobao road to shanghai indoor stadium | 961.2 | 1 | 20 | 20.1 | 34.1 | 16 | 18 | 2 | 20 | 24.6 | 23.6 | 18.3 | 20.4 |
|
|